Mechanical engineering and BIM coordination · Chicago Measure once. Trust always.
In-house design. BIM coordination. Laser scanning.
95%+
Prefab that fits the first time
3–5 hrs
Saved in the field per 8 in BIM
2–3%
Job cost lost to field rework without BIM
½ day
To scan a mechanical room
BIM coordination and laser scanning services Design it. Model it. Prove it.
In-house design
Degreed engineers on staff.
BIM coordination
Leave the coordination meetings to us.
3D laser scanning
Trimble scanners. A point cloud, not a tape measure.
Existing conditions
Accurate down to the millimeter.
Augmented reality
The model over the real room, on site.
Fabrication drawings
Final tie-in pieces built from the scan.
From model to mechanical room Modeled. Then built.
Picture: Mechanical room with white piping along the wall and equipment on the floor.
MODELEDPicture: Mechanical room with an insulated tank, white piping and color-coded pipe drops.
BUILTEvery 8 hours in BIM gives back 3 to 5 hours in the field.No more “verify in field”