Mechanical construction technology Driven by data.
Scan. Model. Fabricate. Track.
95%+
Prefab that fits the first time
½ day
To scan a mechanical room
3–5 hrs
Saved in the field per 8 in BIM
100,000+
sq ft of fab space
How a job runs Capture reality. Model with confidence.
1 · Scan
Millions of points in minutes. No tape measure.
2 · Model
Coordinated in BIM before anything is cut.
3 · Fabricate
Built in the shop, from the model.
4 · See it on site
Augmented reality lays the model over the real room.
5 · Track it
Daily progress on every package.
6 · Run it
Controls and monitoring you can reach from anywhere.
From model to mechanical room Modeled. Then built.
Picture: Mechanical room with white piping along the wall and equipment on the floor.
MODELEDPicture: Mechanical room with an insulated tank, white piping and color-coded pipe drops.
BUILTMeasuring a mechanical room by hand takes all day. Scanning takes half a day and misses nothing.3D laser scanning
Request a quote, service or information Ask a question. Get a number.
One form. A person replies.
630.543.3500